As mentioned in the last club update, a drainage system was set to be installed on our training pitch. Installing the system is critical for the delivery of our community activities and was completed today, with the primary and secondary drainage installed on the training pitch and over seeding completing the job this morning.
We would like to thank all fans who have made contributions in order to make sure we can carry out this work. Anyone who still wishes to make a donation can donate using the link below:
Pictures can be seen below of the work done on the training pitch!
Primary and Secondary drainage completed this morning on the training pitch @LeamingtonFC pic.twitter.com/9wUf3HiVfc
— Woodward Turf Care Ltd (@WoodwardTCare) April 23, 2021